My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ABBEY GROUP - 2016
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
ABBEY GROUP - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2015 12:56:18 PM
Creation date
7/26/2006 10:50:18 AM
Metadata
Fields
Template:
Contracts
Company Name
ABBEY GROUP
Contract #
A-2006-141
Agency
POLICE
Council Approval Date
6/19/2006
Expiration Date
12/1/2006
Insurance Exp Date
3/20/2008
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Statement of Work <br />Santa Ana shall: <br />Assign jail personnel to attend the pre-configuration review. <br />Identify requirements for future implementation, based on Abbey Group's RFP responses. <br />Completion Criteria: <br />This task is considered complete when Abbey Group has identified all configurable options for the JCMS <br />application, has documented the site-specific changes to be included in the base implementation and has <br />identified those modifications that will be provided as part of the next Abbey Group JCMS release. <br />Task 1-D: Requirements Validation process for ]CMS, Mobile Booking, and Interfaces <br />Objective: Review and subsequently document system tailoring and configuration requirements for <br />the following: JCMS, Mobile Booking and any interfaces provided under this agreement. <br />Task Description: <br />Abbey Group will begin preparation of the system specification and intertace control documentation for all <br />supplied software and interfaces. <br />Review meetings will be held for each application subsystem to be installed in order to validate all <br />requirements for tailoring, configuration and the implementation of external interfaces as identified in the <br />above referenced proposal and the interface control document. <br />Using Abbey Group's Functional System Description documents and the intertace control document (ICD), <br />Abbey Group will work with the appropriate Santa Ana staff to validate and document all tailoring and <br />configuration requirements for each subsystem and for each interface to be installed. This information will <br />be summarized in a Change List document to be mutually agreed upon by Abbey Group and Santa Ana. <br />Santa Ana considers standard system tailoring to include the renaming of agency-specific data elements <br />and the reformatting of existing data-entry screens, as well as defining site-specific parameters. <br />Responsibilities: <br />Abbey Group shall: <br />a. Review, with Santa Ana personnel, Abbey Group's Functional System Description documents and <br />validate those items to be tailored and configured. <br />b. Conduct detailed system demonstrations where necessary to aid in the requirements validation <br />process. <br />c. Review the JCMS Functional System Description documents with the appropriate Santa Ana <br />personnel and document any changes and/or corrections that are mutually agreed upon in a <br />Change List. <br />d. Analyze, with Santa Ana personnel, the interface control document included as an exhibit to the <br />contract. <br />e. Submit the Change List to Santa Ana within thirty (30) business days of completion of the <br />Requirements Validation Session for each subsystem. <br />f. Address any deficiencies identified by Santa Ana in the Change List within ten (10) business days. <br />Exceptions to this term can be negotiated between the respective Project Managers at their <br />discretion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.