My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JOHNSON CHAPEL THE AFRICAN METHODIST EPISCOPAL CHURCH WITH GATES DEVELOPMENT 2A
Clerk
>
Contracts / Agreements
>
J
>
JOHNSON CHAPEL THE AFRICAN METHODIST EPISCOPAL CHURCH WITH GATES DEVELOPMENT 2A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:51:50 PM
Creation date
11/6/2006 4:22:22 PM
Metadata
Fields
Template:
Contracts
Company Name
JOHNSON CHAPEL THE AFRICAN METHODIST EPISCOPAL CHURCH with GATES DEVELOPMENT
Contract #
A-2006-264
Agency
PUBLIC WORKS
Council Approval Date
9/18/2006
Notes
AMENDS A-2006-110
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ai+c< ~ Y\rI e n f- I <br /> <br />Change Order #1 Revision a <br />nnnnPage3 <br /> <br />17: Bnilding Dept. required working drawings and details: +$4,682.34 <br />Our original proposal did not include architectural planning, working drawings and details. Th <br />is the add for thc plans and details as required by the city of Santa Ana. <br /> <br />18: Bnilding Dept. required safety boUards: +$920.00 <br />Provide (2) required 4" concrete-steel bo11ards, installed to each side of the alley side exit dool <br />for safety. <br /> <br />19: Replace broken storefront glass panel: <br /> <br />+5596.16 <br /> <br />20: Delete business signage: <br />Delete the busincss signage as requested by the city. <br /> <br />. <S800.00> <br /> <br />Sub Total of this CbaDge Order: <br />OverheadIProfit 100/. <br />Total of this Change Order: <br /> <br />+$59,835.65 <br />+$5,983.56 <br />+$65,819.21 <br /> <br />CONTRACT SUMMARY: <br />Original Contract Amount: +$129,656.75 <br />Add for Performance Bond: +$4,140.00 <br />Add for Change Order #1: +$65,819.21 <br />Revised Contract Amount: +$199,615.96 <br />Amount Previously Paid: <$97,242.57> <br />Balance on Contract: +$102,373.39 <br /> <br /> <br />(YO'" (. <br /> <br />Dare <br />
The URL can be used to link to this page
Your browser does not support the video tag.