My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION 7 (2)
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
URS CORPORATION 7 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:52:38 PM
Creation date
9/14/2007 10:21:51 AM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION
Contract #
A-2007-169
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
5/1/2009
Destruction Year
2018
Notes
Amended by A-2008-141, -001, -002, -03
Document Relationships
URS CORPORATION AMERICAS 7a
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7b
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7c
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7d
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Potential noise sources associated with the subject project will be identified. <br />The source power levels from any project -related mechanical equipment will <br />be obtained from the corresponding equipment manufacturers by the City <br />and/or project proponent and provided to URS for inclusion in the noise <br />analysis. The projected noise levels emanating from this equipment will be <br />calculated and the potential for impact to adjacent noise sensitive land uses <br />will also be determined. An analysis will be made of the potential noise due to <br />on -site traffic related sources. This will include noise from vehicles in the <br />proposed parking lot, vehicle alarms, and delivery trucks. Impacts from these <br />sources on the existing adjacent land uses will be identified. <br />Short-term (construction related) noise sources associated with the proposed <br />project will be identified and assessed and noise impacts will be determined. <br />This will include noise and vibration from various types of construction <br />equipment expected to be used at the site, including the use of pile driving <br />equipment. The type of piles and pile driving equipment proposed to be used <br />for this project will be examined and the potential for impacts to the <br />surrounding community will be determined. This assessment will examine the <br />adjacent land use as well as the distance to the pile driving activity. <br />Should the use of noise mitigation measures be required for either short-term <br />or long-term project related impacts, a series of specific noise mitigation <br />measures will be developed (including types, locations, sizes, materials) <br />which will reduce the impact of project related noise levels to meet the <br />applicable exterior noise standards at the surrounding noise sensitive land <br />uses. This may include a noise and vibration monitoring program to measure <br />the potential impacts of construction noise to the existing residences adjacent <br />to the project site. or recommendations to the types of piles and drivers used <br />during construction. <br />A noise technical report will be prepared documenting the results of the noise <br />measurement survey, detailing the findings of impact, the mitigation measures <br />necessary to reduce those impacts, and level of significance. <br />e. Traffic Study <br />URS understands that a traffic study has already been prepared for another <br />project that was proposed on the project site per our conversation with Shahir <br />Gobran of the City's staff on this matter. Mr. Gobran thought that enough <br />information was available in that study to determine the traffic impacts of the <br />proposed commercial project. We have already requested an electronic copy <br />of the traffic report for URS' review. We are assuming at this time that <br />enough information is available from the existing report to determine the <br />commercial project's impacts on traffic on Harbor Boulevard and the <br />surrounding area and to fill out the project Initial Study. <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.