Laserfiche WebLink
Orange County Grade Crossing Safety Improvement Program COST ESTIMATE <br />02459 -02 <br />REHAB EXISTING GRADE CROSSING PANELS BY OTHERS <br />TF <br />02513 -01 <br />COLD MILL 2.5" AC <br />64 <br />$1,200 <br />$76,800 <br />02513 -02 <br />2.5 "AC PAVEMENT <br />SF <br />1,614 <br />$2 <br />$3,228 <br />02513 -04 <br />7 "ACPAVEMENT <br />SF <br />1,614 <br />$4 <br />$6,456 <br />REMOVE EXISTING PAVEMENT AND BASE AND INSTALL NEW AC PAVEMENT <br />SF <br />700 <br />$11 <br />$7,700 <br />AND BASE TO MATCH EXISTING PAVEMENT SECTION (MINIMUM 4" AC OVER <br />02513 -09 <br />8" AB <br />SF <br />61 <br />$15 <br />$915 <br />8" FULL DEPTH CONCRETE CURB(EXCAVATION, WASTES OFFSITE AND <br />02528 -04 <br />BACKFILL SHALL BE CONSIDERED INCIDENTAL WORK <br />LF <br />546 <br />$25 <br />$13,650 <br />6" PCC SIDEWALK (EXCAVATION, WATES OFFSITE, IMPORT AND GRADING <br />02528 -06 <br />SHALL BE CONSIDERED INCIDENTAL WORK <br />SF <br />882 <br />$25 <br />$22,050 <br />PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE <br />SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH <br />02528 -11 <br />WITH TOP OF CURB <br />SF <br />786 <br />$15 <br />$11,790 <br />02580 -01 <br />SIGNING <br />LS <br />1 <br />$5,450 <br />$5,450 <br />02580 -02 <br />STRIPING <br />LS <br />1 <br />$7,298 <br />$7,298 <br />02820 -01 <br />4' HIGH WELDED WIRE MESH FENCE <br />LF <br />60 <br />$20 <br />$1,200 <br />REMOVE EXISTING 6' HIGH CMU WALL AND CONSTRUCT MATCHING CMU <br />04220 -04 <br />WALL AT BE CORNER OF RITCHEY <br />LF <br />20 <br />$120 <br />$2,400 <br />05520 -01 <br />HAND RAILING PER A.P.W.A. STD. PLAN 606 -2, TYPE A <br />LF <br />22 <br />$60 <br />$1,320 <br />SELF CLOSING SWING GATE ASSEMBLY INCLUDING FABRICATION, <br />05521 -01 <br />FOUNDATION, AND INSTALLATION <br />EA <br />4 <br />$14,800 <br />$59,200 <br />09616 -01 <br />ADA DETACTABLE WARNING SURFACE <br />SF <br />64 <br />$45 <br />$2,880 <br />2890 -15 <br />TRAFFIC SIGNAL IMPROVEMENTS - RITCHEY STREET <br />LS <br />1 <br />$186,000 <br />$186,000 <br />8000 -01 <br />RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES— BY OTHERS <br />LS <br />1 <br />$278,000 <br />$278,000 <br />CONSTRUCTION <br />SUBTOTAL <br />$701,125 <br />CONTINGENCY <br />$70,113 <br />Schedule 40B <br />- City of Santa Ana, Ritchey Street Crossing <br />TOTAL <br />$771,238 <br />Run ... 8 /17108 100% Submittal 8/15/2008 <br />