Laserfiche WebLink
(2) <br /> CITY OF SANTA ANA <br /> H. Door Assembly <br /> MATERIALS REQUIRED PER DOOR <br /> • 1 - 1/2" CDX PLYWOOD SHEET- CUT TO DIMENSIONS OF DOOR FRAME (WEATHER SIDE) <br /> 1 - 1/2" CDX PLYWOOD SHEET- CUT TO OUTSIDE DIMENSIONS OF DOOR FRAME TRIM <br /> (INSIDE) <br /> • 6—2X4 BRACES - 3 CUT TO WIDTH OF OUTSIDE PLYWOOD <br /> - 3 CUT TO WIDTH OF INSIDE PLYWOOD <br /> 1 -2X4 BOTTOM BRACE- CUT TO WIDTH OF DOOR TRIM DRILLED TO FLOOR (INSIDE) <br /> • 6 -CARRIAGE BOLT ASSEMBLIES <br /> NUMBER OF DOORS TO BE SECURED (ND): <br /> NUMBER OF DOOR BRACES REQUIRED: (No X 6) <br /> NUMBER OF BOTTOM BRACES REQUIRED: (No) <br /> CARRIAGE BOLT ASSEMBLIES REQUIRED (BD): (ND X 6) <br /> I. Carriage Bolt Assembly <br /> MATERIALS REQUIRED PER CARRIAGE BOLT ASSEMBLY <br /> • 1 -3/8" X 12' (OR LONGER IF NECESSARY) CARRIAGE BOLT- COURSE THREAD <br /> • 1 - 1/2" USS STANDARD FLAT WASHER (WEATHER SIDE) <br /> • 1 -3/8" USS STANDARD FLAT WASHER (INSIDE) <br /> • 1 -3/8" CONSTRUCTION GRADE NUT- COURSE THREAD <br /> TOTAL CARRIAGE BOLT ASSEMBLIES REQUIRED FOR WINDOWS AND DOORS: <br /> (BW+ BD) <br /> J. Removal of Trash and Debris <br /> 1) The Contractor shall be responsible for the removal and proper disposal of all trash, debris, and <br /> waste materials generated during the demolition of any structure under this Agreement. This <br /> includes, but is not limited to, construction materials, rubble, hazardous waste, and any other by- <br /> products of the demolition process. <br /> 2) All trash and trash and debris must be removed from the site within seven (7) days following the <br /> completion of demolition activities. The Contractor shall ensure the site is left in a clean and <br /> orderly condition, free of any remaining debris. <br />