My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A Scope of Work – Graviton Consultant Agreement <br /> 62 <br />Deliverable Acceptance Criteria WBS ID City Role Graviton Role <br />changes during the design stage. Those <br />changes will culminate in a Change Impact <br />Analysis deliverable being submitted during <br />the build stage. <br /> <br />Graviton will provide the templates, tools, and <br />direction for the Change Impact Analysis. All <br />project team members will be tasked with <br />recording change and change impacts <br />throughout implementation. <br />changes throughout <br />implementation. The City <br />will assist Graviton in <br />determining the impact of <br />those changes on City <br />departments and <br />stakeholders. Following its <br />submission, the City will <br />review deliverable content, <br />provide feedback, and <br />approve deliverable work <br />products. <br />and will develop an impact <br />analysis. Graviton will <br />review the impact analysis <br />content with the City and <br />will incorporate City <br />feedback before submitting <br />the deliverable for approval. <br />Department <br />Readiness <br /> <br />Department work plans will be developed <br />during the Build stage and updated through <br />the deploy stage. Prior to the conclusion of <br />the test stage the project team will assess <br />department readiness for implementation. <br />Department readiness will be measured by <br />reviewing the progress of individual <br />departments against their corresponding <br />department work plans along with outreach to <br />some or all departments as required. The <br />Department Readiness Assessment deliverable <br />will be completed during the test stage of the <br />project. <br /> <br />Graviton will develop department workplans <br />in Smartsheet, and the City will assign the <br />workplans to the departments and gather <br />status. <br />1.4.4 Phase 1 HCM <br />2.4.4 Phase 2 ERP <br />The City is responsible for <br />leading City staff in the <br />coordination of Department <br />Readiness tasks. The City <br />will distribute Graviton <br />developed department work <br />plans and will coordinate the <br />gathering of status with the <br />City departments. The City <br />will escalate issues and risks <br />to departments and will <br />facilitate project team <br />support of those <br />departments. <br />Graviton will support the <br />City in the completion of the <br />Department Readiness <br />deliverable work products. <br />Graviton will facilitate the <br />planning of the deliverable, <br />actively participating in the <br />deliverable related work <br />sessions and complete <br />assigned deliverable related <br />tasks. <br />Operations <br />Transition Plan <br /> <br />Critical to the project will be the eventual <br />transition of the system administration and <br />support into a steady state operational model. <br />The purpose of the Operations Transition Plan <br />deliverable is to provide the City with specific <br />and detailed recommendations for post <br />1.4.5 Phase 1 HCM <br /> <br />The City is responsible for <br />assisting Graviton in the <br />completion of the <br />Operations Transition Plan <br />deliverable. The City will <br />actively participate in <br />Graviton is responsible for <br />leading the project team in <br />the completion of the <br />Operations Transition Plan <br />deliverable. Graviton will <br />plan, facilitate, and execute <br /> <br /> <br />City Council 16 – 79 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.