My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Rehabilitation from Memory Lane to North City Limits and Bedford Road <br />Rehabilitation at Mainplace Drive <br />August 5, 2025 <br />Page 4 <br />5 <br />2 <br />4 <br />6 <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $990,716. <br />Project Item Total <br />Construction Contract Bid Amount $792,573 <br />Construction Administration $56,830 <br />Inspection $44,325 <br />Testing $17,730 <br />Project Contingencies $79,258 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST $990,716 <br />Project Schedule and Contract Time <br />The project completion date is October 2025 barring unforeseeable conditions such as <br />rain, natural disasters, or other delays beyond the control of the City and of the <br />Contractor. The contract time for this project is 45 working days, as specified in the bid <br />documents. Working days are counted in accordance with the City’s Standard <br />Specifications, which exclude weekends, City-observed holidays, and inclement <br />weather days that prevent work. <br />The actual completion date will depend on the contractor’s schedule, material <br />procurement timelines, and any unforeseen delays. Based on a typical project timeline, <br />the estimated project completion is provided below; <br />Project Milestones <br />Milestone Estimated <br />Completion Date <br />Notes <br />Administrative Startup August 14, 2025 Contract execution, bonds, <br />insurance <br />Material Procurement September 2, 2025 Procurement may take place <br />concurrently with construction. <br />Contractor Mobilization September 2, 2025 Start of construction activities <br />Project Completion October 31, 2025 Based on 45 working days <br />The contractor will be constructing this project in a singular phase, fulfilling the scope of <br />work as outlined in the contract documents. The contractor is responsible for <br />determining the scheduling and sequencing of activities based on their proposed means <br />and methods. <br />Public Outreach <br />The project scope spans across the stretch on Main Street between Memory Lane and <br />North City Limit, and will impact nearby businesses and residences. Prior to Bid <br /> <br /> <br />City Council 17 – 4 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.