My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BROOKHURST DEVELOPMENT
Clerk
>
Contracts / Agreements
>
B
>
BROOKHURST DEVELOPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 2:09:54 PM
Creation date
9/5/2025 2:09:32 PM
Metadata
Fields
Template:
Contracts
Company Name
BROOKHURST DEVELOPMENT
Contract #
N-2025-225
Agency
Public Works
Expiration Date
6/30/2026
Insurance Exp Date
2/12/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r®o hur t 0 I r* & Advisortjcarp <br /> S;n2CIA11Sf51nAINIC Alvdto FdOlIty S0111A sS SIX91996 <br /> • Security and Life-Safety Systems. BDC will conduct visual <br /> observations and note the presence of security and life-safety systems <br /> such as smoke detectors and fire sprinklers. However, these systems <br /> will not be tested, nor will we opine to their adequacy or compliance to <br /> codes. <br /> 2) Photography and Drone Video Imagery <br /> • Photography. Photograph building elements that are being assessed <br /> including those elements that require particular attention. Photographs <br /> will be included within the final report to facilitate discussions. All <br /> photographs, including those that are not presented within the report will <br /> be provided OCFA on a separate archival thumb/zip drive at the time of <br /> report submission. <br /> • Drone Video. Drone videography will be conducted for each station and <br /> be used to inspect inaccessible exterior roof and building conditions, and <br /> if requested, be presented to OCFA and city staff to facilitate <br /> discussions. Drone videos will be provided to OCFA on the same <br /> archival thumb/zip drive as the photographs. <br /> 3) Deliverables— Comprehensive Facilities Assessment Report <br /> • Conditions Assessment and Recommendations. The final updated <br /> FCA report will include a narrative discussing each of the findings and <br /> recommendations as they pertain to the above scope of inspection work <br /> conducted for all ten Division 6 stations. Where applicable, the report <br /> will reference those building elements that were observed using drone <br /> video. <br /> • Cost Estimation. The report will provide a Rough Order of Magnitude <br /> ("ROM") of estimated costs for each of the recommended capital <br /> upgrade or construction work for each station. This cost estimation will <br /> also include cost proposals submitted to BDC by reputable licensed <br /> contractors that have experience in the local market contracting for <br /> similar size and scope of renovation, or equipment sales and installation <br /> as recommended by the report. When warranted, BDC will provide cost <br /> estimates for any station's full redevelopment when warranted. <br /> • Assess Any Functional Obsolescence/Cost-Benefit Analysis. <br /> Working in close collaboration with OCFA personnel, BDC will assess <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.