My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Agreement with the Municipal Water District of Orange County for Shared Programs
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 18 - Agreement with the Municipal Water District of Orange County for Shared Programs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:23 AM
Creation date
9/10/2025 9:35:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />July 23, 2025 <br />10 <br /> <br /> <br />x Participant Agency will only bill MWDOC/Metropolitan for the square footage <br />measured. <br /> <br />x Participant Agency must adopt these Inspection Procedures as their own or, <br />alternatively, to develop and submit for approval by Metropolitan and/or MWDOC <br />Participant Agency’s own inspection and verification procedures document in line with <br />the requirements and procedures contained in this document. MWDOC/Metropolitan <br />Participant Agency to submit them. MWDOC/Metropolitan may perform onsite and <br />will require inspections of projects prior to payment. Result of the inspection may <br />affect payment made to Participant Agency <br /> <br />x All projects that require inspection must be inspected prior to Participant Agency <br />invoicing MWDOC. MWDOC may request inspection reports from Participant Agency at <br />any time. <br /> <br />Turf Replacement Participation Procedure <br />The Turf Replacement Rebate Program Process, as it currently exists, is depicted in the following chart. <br />The process flow is broken down into 11 distinct steps starting with the Customer Application Submittal <br />and ending with Metropolitan and Participant Agency Invoicing. The 11 steps are as follows: <br />Step 1: Online Application and Document Submittal Process <br /> <br />Performed by the Customer <br /> <br />Step 2: Application Review Process and Pre-Inspection Distribution <br />Performed by MWDOC <br />Step 4: Pre-Installation Inspection Process <br />Performed by Participant Agency or Inspection Vendor and sent to MWDOC for review <br />Step 5: Letter to Proceed or Denial Letter to Customer <br />Performed by MWDOC <br />Step 6: Participant Project Installation and Project Completion Notification <br />Performed by Customer <br />Step 7: Initial Project review, Post-Work Order Generation and Distribution <br />Performed by MWDOC <br />Step 8: Post-Installation Inspection Process <br />Performed by Participant Agency, MWDOC, or Inspection Vendor and sent to MWDOC <br />for review. <br />Step 9: Application Approval or Denial and Invoice Review Process <br />Performed by MWDOC <br />Step 10: The Rebate Check Run and W-9 Request Process <br />"!# <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.