My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2025
>
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:52:20 AM
Creation date
9/25/2025 9:50:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conveyance and treatment infrastructure would not be cumulatively considerable, and cumulative <br /> impacts related to wastewater treatment would be less than significant. (Draft Supplemental EIR, <br /> p. 4.15-36.) <br /> Stormwater <br /> The extent of analysis of cumulative impacts for storm drainage systems is contiguous with the <br /> City and Orange County Flood Control District (OCFCD) service areas. Depending on the project <br /> type and design (e.g., new construction or significant reconstruction), buildout of the GPU and all <br /> related projects could cumulatively increase stormwater flows, potentially requiring the relocation <br /> or construction of new or expanded stormwater facilities; however, they would adhere to the <br /> requirements of the NPDES and applicable permits (e.g., MS4, Industrial General Permit, and <br /> Construction General Permit), which prevent post-development stormwater flows from exceeding <br /> pre-development flows. Further, GPU buildout and the related projects would undergo the <br /> development and review process and require hydrology studies as needed to assess stormwater <br /> runoff and drainage. As such, GPU buildout and the related projects would result in less than <br /> significant cumulative impacts related to stormwater. <br /> The Project's grading and storm drain network would be designed to match the existing drainage <br /> and flow patterns to best utilize the capacities available in the existing public storm drain system. <br /> The Project would integrate bio-filtration methods, pervious surfaces, and selective plant materials <br /> to encourage on-site water retention to ensure less than significant impacts related to stormwater <br /> drainage. Therefore, the Project's contribution to cumulative impacts related to stormwater or <br /> —infrastwctu-re-would-not-be-cumulativvely-considerable,and t_hug--umulati-ve-impac-ts-to-stcrmwater —or infrastructure would be less than significant. (Draft Supplemental EIR, pp. 4.15-36—4.15-37.) <br /> Solid Waste <br /> The extent of analysis of cumulative impacts for solid waste collection and disposal services is <br /> contiguous with the Waste Management of Orange County service area Solid waste generated <br /> by GPU buildout and the related projects within the City of Santa Ana would be primarily disposed <br /> of at the Frank R. Bowerman Sanitary Landfill in Irvine and the Olinda Alpha Landfill in Brea. The <br /> Orange County solid waste landfill system would continue maintain the 15-year countywide solid <br /> waste landfill capacity as required by AB 939. Both landfills have sufficient capacity to <br /> accommodate solid waste generated by the related projects and the Project. Moreover, the <br /> Project and related projects would comply with all regulatory requirements to reduce solid waste <br /> generation, including the requirements of AB 939, CALGreen, AB 341, and AB 1826, which would <br /> reduce the amount of solid waste generated. Therefore, the Project's contribution to cumulative <br /> impacts related to solid waste would not be cumulatively considerable, and as such, cumulative <br /> impacts to solid waste would be less than significant. (Draft Supplemental EIR, <br /> pp. 4.15-37—4.15-38.) <br /> Dry Utilities <br /> The extent of analysis of cumulative impacts for dry utilities (i.e., natural gas and electricity <br /> services) is contiguous with the Southern California Gas Company and Southern California <br /> Edison service areas. Although future developments would result in the use of renewable and <br /> nonrenewable electricity and natural gas resources during construction and operation, which <br /> could limit future availability, the sizes and types of uses proposed by the GPU buildout and <br /> Resolution No. 2025-041 <br /> Page 64 of 140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.