My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ <br />o Photographs illustrating the spill origin, <br />conveyance system entrance and exit, <br />conditions; <br />the extent and reach of the spill, drainage <br />receiving water, and post -cleanup site <br />o Diagram showing the spill failure point, appearance point(s), the spill flow path, <br />and ultimate destinations; <br />o Detailed description of the methodology employed, and available data used to <br />calculate the discharge volume and, if applicable, the recovered spill volume; <br />o Detailed description of the spill cause(s); <br />o Description of the pipe material, and estimated age of the pipe material, at the <br />failure location; <br />o Description of the impact of the spill; <br />o Copy of original field crew records used to document the spill; and <br />o Historical maintenance records for the failure location. <br />2. Enrollee's response to the spill: <br />o Chronological narrative description of all actions taken by the Enrollee to <br />terminate the spill; <br />o Explanation of how the Sewer System Management Plan Spill Emergency <br />Response Plan was implemented to respond to and mitigate the spill; and <br />o Final corrective action(s) completed and a schedule for planned corrective <br />actions, including: <br />■ Local regulatory enforcement action taken against an illicit discharge in <br />response to this spill, as applicable, <br />■ Identifiable system modifications, and operation and maintenance program <br />modifications needed to prevent repeated spill occurrences, and <br />■ Necessary modifications to the Emergency Spill Response Plan to <br />incorporate lessons learned in responding to and mitigating the spill. <br />3. Water Quality Monitoring, including at minimum: <br />o Description of all water quality sampling activities conducted; <br />o List of pollutant and parameters monitored, sampled and analyzed; as required in <br />section 2.3 (Receiving Water Monitoring) of this Attachment; <br />o Laboratory results, including laboratory reports; <br />o Detailed location map illustrating all water quality sampling points; and <br />o Other regulatory agencies receiving sample results (if applicable). <br />4. Evaluation of spill impact(s), including a description of short-term and long-term <br />impact(s) to beneficial uses of the surface water. <br />ATTACHMENT E1 — NOTIFICATION, MONITORING, REPORTING <br />AND RECORDKEEPING REQUIREMENTS <br />December 6, 2022 <br />E1 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.