My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FN City of Santa Ana l First Street Multimodal Corridor <br /> Technical Memorandum <br /> FIRST STREET MULTIMODAL BOULEVARD <br /> DESIGN OPTIONS <br /> Option 6: 4 Lanes with Bike Lane & Bus Lane <br /> O O Adds Protected Bikeway&Adjacent Sidewalk l* <br /> Longer Crossing Distance 0 <br /> Reconstructs Median*$ <br /> Reduces Lanes from 6 to 4 0 <br /> Buses Stop in Dedicated Bus Lane* <br /> + Transit Signal Priority&Bike Signal at Intersections Los Angeles,CA <br /> 1� <br /> 5 <br /> 3 <br /> Pad/Bike Zane Road�ayZoae(86') <br /> 1 $ <br /> 1 <br /> 4 4 <br /> 2Ped/Bik.Zen. <br /> ✓ Benefits: x Challenges: <br /> • Protected Bikeway at Sidewalk Level Improves Comfort • May Increase Delay for Vehicles <br /> • Sufficient Space for Landscape&Streetscape • Limited Barrier Between Bikes&Pedestrians <br /> • Improved Bus Performance • Utilities May Be Impacted with Curb Relocation <br /> Qc, _;- p Moving <br /> = LN'c` Forward <br /> Stay Updated 4T7 on First <br /> .'11 r- bit. rdOn First <br /> City Council 12 —47 5/5/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.