Laserfiche WebLink
Award of a Construction Contract to All American Asphalt for the Construction of the Raitt <br /> Street Improvements Project <br /> May 19, 2026 <br /> Page 3 <br /> through the installation of bulb-outs and bike lanes. Pedestrian facility improvements will <br /> comply with Americans with Disabilities Act (ADA) standards. Funding for these <br /> improvements in the amount of $5,200,624 is funded through Gas Tax, General Fund, <br /> and savings from completed projects. <br /> The project also includes traffic improvements such as the installation of a traffic signal, <br /> installation of hybrid beacons, enhanced traffic striping and pavement markings, and <br /> traffic signal modifications that incorporate video detection at the intersections. <br /> Additionally, the project will install drought-tolerant landscaping and irrigation at key <br /> locations within corridor. Once completed, these improvements will enhance overall <br /> safety, ride quality, and the visual appearance of the street corridor. <br /> Grant Funding <br /> The City received grants for the design and construction of the project from the State in <br /> the amount of$5,499,000 of which $4,610,000 are for the physical construction <br /> elements of the project. The funds will be specifically used to fund the active <br /> transportation elements of the street improvement project including traffic signals, <br /> striping, and safety enhancing elements. The grants require that this project be <br /> completed by June 30, 2028. <br /> Project Advertisement and Contractor Procurement <br /> To provide an opportunity for local vendors to submit bids, the City notified a total of 96 <br /> regional vendors via PlanetBids, many of which are Santa Ana based. A total of seven <br /> bids were received. One bid was received from a Santa Ana contractor. <br /> As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br /> newspaper on March 26, 2026 and April 2, 2026. The project was also advertised in <br /> PlanetBids from March 20, 2026 to April 9, 2026. Bids were received electronically via <br /> PlanetBids on April 9, 2026. No bid protest was submitted by any of the bidders during <br /> the bid protest period. <br /> A copy of construction plans, contracts, specifications, and all related reference <br /> materials (such as The Greenbook) are available for public review at the City's Public <br /> Works Agency, Central Files office located in City Hall. <br /> Bid Results Summary <br /> RANK BIDDER'S NAME LOCATION BASE BID + <br /> ALTERNATES <br /> 1 All American Asphalt Corona, CA $7,848,499 <br /> 2 Excel Paving Co. Long Beach, CA $8,175,239 <br /> 3 Vido Samarzich, Inc. Santa Ana, CA $8,402,798 <br /> 4 Onyx Paving Company Yorba Linda, CA $8,882,000 <br /> 5 Hardy & Harper, Inc. Lake Forest, CA $10,075,000 <br />