My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Award a Construction Contract to All American Asphalt for the Construction of the Raitt Street Improvements Project (Project Nos. 23-6998, 19-6947, 26-6716)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/19/2026 Regular, Special HA
>
Item 17 - Award a Construction Contract to All American Asphalt for the Construction of the Raitt Street Improvements Project (Project Nos. 23-6998, 19-6947, 26-6716)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 11:37:59 AM
Creation date
5/13/2026 11:37:28 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
17
Date
5/19/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award of a Construction Contract to All American Asphalt for the Construction of the Raitt <br /> Street Improvements Project <br /> May 19, 2026 <br /> Page 4 <br /> 6 Axiom Group Los Angeles, CA $11,301,690 <br /> 7 Legion Contractors, Inc. Los Angeles, CA $12,984,673 <br /> A total of seven bids were received and seven were deemed responsive. All American <br /> Asphalt submitted the lowest responsive base bid in the amount of $7,785,199 (Exhibit <br /> 2). As specified in the bid documents, the lowest bid shall be determined on the basis of <br /> the Base Bid. The add-alternate scope of work in the bid package includes the <br /> installation of irrigation, new water service, and backflow prevention assembly. The total <br /> bid including the add-alternate scope of work is in the amount of $7,848,499 and is still <br /> collectively lower than the other bids including the alternative. Based on the bid analysis <br /> and a contractor's reference check, staff recommends awarding the construction <br /> contract to All American Asphalt (Exhibit 3). <br /> All American Asphalt has previously performed work as a prime contractor in the City of <br /> Santa Ana within the last five years, including projects such as Main Street <br /> Rehabilitation from Memory Lane to City Limit, Local Street Preventative Maintenance <br /> Fiscal Year 23-24, and Grand Avenue Rehabilitation from McFadden Avenue to First <br /> Street. <br /> Project Delivery <br /> To deliver a complete project, in addition to the construction contract, the estimated total <br /> project delivery cost includes a budget allocation for construction administration, <br /> inspection, and testing. Construction administration and inspection may be performed <br /> by either staff or consultants and includes construction management, inspection of the <br /> Contractor's work to ensure contract compliance, workmanship and quality, materials <br /> testing, and implementation of the labor requirements. <br /> Any of the allocated construction administration funds not spent are considered project <br /> savings and are returned to the respective fund balance upon close out of the project. <br /> As indicated in the Cost Analysis and as summarized in the table below, the estimated <br /> total construction delivery cost of the project is $9,810,624. <br /> Project Item Total <br /> Construction Contract Bid Amount $7,848,499 <br /> Construction Administration $627,880 <br /> 1 ns ection $392,425 <br /> Testing $156,970 <br /> Unanticipated or Unforeseen Work $784,850 <br /> TOTAL ESTIMATED CONSTRUCTION DELIVERY <br /> COST $9,810,624 <br />
The URL can be used to link to this page
Your browser does not support the video tag.