Laserfiche WebLink
SCOPE OF SERVICES CITY OFSANTAANA `J <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> MARK THOMAS <br /> Task 7 Roadway/Civil Improvements • Grading Sheets (5, 20 Scale) <br /> • Total Sheets: 51 <br /> The full suite of roadway, traffic, lighting, utility, 7.2.2 Survey Control Plans <br /> drainage and landscape plans will be produced, <br /> adhering to the City and SCRRA submittal Mark Thomas will prepare the Survey Control <br /> requirements. plans sheets for the 65%, 95%, 100%, and Final <br /> 7.1 Concept Development submittal phases of the Engineering Design. It is <br /> assumed that the following is required: <br /> Mark Thomas will provide preliminary geometric . Survey Control Plan (2) <br /> drawings for the Metrolink"A" submittal (5%) level. <br /> The geometric drawings will include the following: 7.2.3 Signing &Striping <br /> • Plans, typical sections, profiles (Santa Ana Mark Thomas will develop signing and striping <br /> Boulevard, Fuller Street, Logan Street, plans for Santa Ana Boulevard, covering the <br /> entrance to SARTIC). segment from Santiago Street to Grand Avenue, to <br /> • Plans will generally include geometric support the integration of the grade separation <br /> conditions, striping configuration, drainage between Santa Ana Boulevard and railroad. <br /> considerations, right of way impacts, and Signing & Striping Plan (1, 40 scale) <br /> approximate limits of grading. <br /> • Any nonstandard design elements will be 7.2.4 Staging, Traffic Handling, Detours, Site <br /> documented (City, SCRRA) and will be Control and Fencing Plan <br /> included in a memorandum as part of Task Mark Thomas will develop staging and traffic <br /> 4.1 and 4.2. handling plans following the latest CAMUTCD <br /> • Preliminary Bridge Improvement Layout for edition. At each stage, at least one travel lane in <br /> up to two (2) bridge alternatives. both directions and pedestrian access along Santa <br /> • Preliminary Stage Construction Concept. Ana Boulevard will remain open. The detour plans <br /> 7.2 Roadway Improvements will be based on the latest CAMUTCD edition. The <br /> Site Control and Fencing Plan includes identifying <br /> Mark Thomas will develop the following right-of-way and easement limits, and applicable <br /> improvement plans for the standard sequence of railroad agency and city standards, and <br /> 35%, 65%, 95%, 100%, and Finale coordination with the railroad agency and city to <br /> 7.2.1 Roadway Plans confirm site control and fencing requirements. The <br /> plan shall identify permanent and temporary site <br /> The following sheets (and number of sheets) are control areas and define required fencing along the <br /> anticipated for the Santa Ana Boulevard rail corridor and construction limits to protect <br /> Underpass: railroad operations, the public, and construction <br /> • Title 1 Index 1 Key Map 1 General Notes (5) activities. Fencing limits, types, heights, and gate <br /> • Typical Sections (4) locations shall conform to City standards, railroad• Disposition and Demolition Plans (5, 20 standards, and agency's safety requirements. <br /> Scale) • Stage Construction f Traffic Handling Plans <br /> • Roadway Design plans Santa Ana (12, 40 scale) <br /> Boulevard (4, 20 Scale) • Detour Plans (2, 200 scale) <br /> • Profiles Santa Ana Boulevard (4, 20 Scale) • Site Control and Fencing Plans (3, 40 <br /> • Roadway Plan and Profiles Other Streets scale) <br /> (9, 20 Scale) • Total Sheets: 17 <br /> • Intersection Grid Details (2, 10 Scale) <br /> • Curb Ramp 1 Driveway Details (5, 10 Scale) <br /> • Offsite Grading (6, 20 Scale) <br /> • Miscellaneous Details (2) <br />