My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> AECIIV <br /> <br /> . . ~~~~i~~.°~~w~~~~:~.L. ~ Structure can be used forthe structure type. <br /> Development of the PSRE and PRE will require the <br /> preparation of a bridge Advance Planning Study (APS) Precast units can expedite the construction schedule, <br /> for Santa Ana Boulevard Underpass. The purpose of the helping to reduce impacts to both the rail and the road <br /> APS is to evaluate feasible structure types, understand traffic. In addition, a precast, simply supported <br /> City requirements, identify constraints, and develop structure is the preferred railroad bridge type because <br /> associated cost estimate summary for the structure of its flexibility for repair and replacement in the future. <br /> work involved. The APS General Plan (GP) clearly Significant shoring would be required around the <br /> delineates all the structural elements identified in the construction area when constructing the bridge. <br /> PSRE and the PRE typically usingthe minimum detailing Retaining walls would be required for both the roadway <br /> necessary and basic dimensions, which will help depression and the raise of the rail profile. In order to <br /> develop a reasonable cost estimate. As a minimum, the facilitate the traffic staging/handling during the <br /> APS GP will show Plan, Elevation, and Typical Section construction, the walls constructed parallel to Santa <br /> views and will make note of all critical assumptions. Ana Boulevard could be constructed using "top-down" <br /> Additional APS's will be prepared as appropriate to construction; that is to build the wall first, and then <br /> consider alternative structure types. The APS General excavate the roadway in front of the wall to final grade. <br /> Plan and APS Report will be prepared on the most We will perform Value Analysis to determine the most <br /> current Caltrans APS formatted plan sheet, and cost effective retaining wall type, top down approach vs. <br /> templates respectively. conventional cantilever retainingwall usingtemporary <br /> shoring. <br /> Structure Preliminary Geotechnical Reports (SPGR) are <br /> required as part of APS to identify basic site A Single Span Structure Alternative can also be <br /> parameters, which may have a significant impact on the considered. The span length required to span the Santa <br /> structure scope and cost. In addition, a comprehensive Ana Boulevard roadbed is approximately 134'. The <br /> design memo must be prepared to summarize and typical span range for this type of construction extends <br /> document the following key items: to about 150-ft under Cooper E-80 loading. Therefore, <br /> even though the required span is nearingthe upper limit <br /> • Important or unusual design assumptions or of the typical structure span length, this structure type <br /> structure features. is suitable for construction of new underpass. The total <br /> • Discussions with City/OCTA/SCRRA personnel structure depth for the replacement of the double track <br /> concerning any key assumptions. would be approximately 13'-6". Provisions can be made <br /> • Modifications from Structure Maintenance in the bridge design so that is capable of supporting a <br /> Records recommendations. future third track, should this become a requirement of <br /> • Seismic retrofit modifications. OCTA/SCRRA. To support a possible third track, the <br /> • City requirements such as aesthetics, through girder, on the either left or right side of the <br /> improvements in vicinity of the structure, underpass, will be required to have a structure depth <br /> airspace usage, or other obstructions. approaching 15' in order to support the full weight of a <br /> • Special foundation requirements, special Cooper E-80 live load. <br /> excavations such asTypeA, Type D, and/or <br /> hazardous or contaminated material. During the APS development, through a careful and <br /> Special construction requirements, including deliberate process, we will study a number of different <br /> limited site accessibility. structure alternatives and configurations against <br /> Stage Construction. various interchange alternatives, and develop <br /> associated costs. <br /> The information identified in the APS, as listed above, <br /> and preliminary structure costs are used as a part of the Deliverables: <br /> evaluation to select the best project alternative. Draft and Final Structure Type Selection Report <br /> I i i ~~d If~ ~ ~ ~ l .R iii llii i <br /> It is proposed to construct a railroad bridge by lowering <br /> the Santa Ana Boulevard. III ~~lo ~ilil~~t~~~~~ <br /> We will identity and coordinate with the various utility <br /> A 2-Span Structure Alternative would work very well at companies for the location and descriptions of their <br /> this location. This proposed double track railroad facilities, including any potential for future utility <br /> bridge structure is approximately 126.7 feet long and improvements. <br /> 40.3 feet wide, with no skew to Santa Ana Boulevard. A <br /> Pier Bent is needed in the median of Santa Ana Utility Meetings and Utility Coordination <br /> Boulevard, which will result in the maximum span Coordinate and schedule meetings with Utility Owners <br /> length of 63.3 feet, and therefore a SCRRA Standard and project stake holders as may be required. <br /> Precast/Prestressed (PC/PS) Double Cell Box Girder <br /> r~i f~, <br /> fr. ~~,.y~on. <br /> <br /> Ii:~ir~l~~s~l fir p:~r~Ue~~ t~~y Re~~~r~: ~;q~uiiv~~e~~: ire ~ I::' i p:~l~ins fair <br /> <br /> w,~~~ ir~~ Il~~l~v~ir~ r~~ e ~~~r~t'i~n I~° r~"eat <br /> ~ ~ ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.