Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />shown on the Conceptual Drawings" or "as described in the Scope of Work." <br />Inspections: Visual Verifications and examinations to determine compliance to the <br />Contract Documents and satisfactory conditions, accuracy, safety, or Performance. <br />Interface: <br />a. The defined common boundary between two systems or subsystems that <br />may be electrical, mechanical, functional, or contractual. <br />b. A point where a system, subsystem or component comes into functional or <br />physical contact with another. <br />M <br />Manufacturer: The Original Equipment Manufacturer (OEM) defined as the producer or <br />supplier of materials, equipment, or apparatus for installation on the vehicle. <br />Memorandum of Understanding: Agreements between Local Agencies, departments, <br />and stakeholders in the Program. <br />N <br />Non Compliance or Non Conformance: Any part, procedure, specification, or Drawing <br />that does not conform to contractual orspecified requirements. <br />P <br />Party, Parties: Entities entering into a legally binding CONTRACT. <br />Performance: The functional effectiveness obtained by a system, subsystem, part, or <br />an element asspecified. <br />Phase: Project timeframe defined by milestones. <br />Previous consultant: A person, persons, firm, partnership, corporation, or combination <br />thereof which had entered into a CONTRACT with AUTHORITY and provided <br />Engineering and Design services, as identified in this Scope of Work. <br />Program: Bravo! Bus Rapid Transit Program. <br />Q <br />Quality Assurance/Quality Control: Planned and systematic activities necessary to <br />provide adequate confidence that items and services conform to the requirements and <br />Scope of Work 115 05/18/10 <br />