My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
25C - AGMT - RIGHT-OF-WAY DEMO SURVEY AND ENVIR ASMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:35 PM
Creation date
3/31/2011 2:19:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
4/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCity of Sonto Ano <br />historical documents, and written text are provided in support of conclusions and <br />recommendations. <br />As required by the EPA and ASTM standards, the results of the ESA will be reported by an <br />Environmental Professional. The Report will be peer reviewed and signed by the Project <br />Manager and/or Project Director. <br />Phase 11 Site Investigation <br />A Phase II site Investigation may be recommended if recognized environmental conditions are <br />identified on the site during the Phase I ES A. SCS recognizes that current and/or proposed <br />future uses of a site are important considerations in developing recommendations for additional <br />site work (i.e., residential use, roadways, childcare facilities, etc.). Further, it is the SCS Team's <br />job to ensure the Phase II site Investigation includes the collection, analysis, and reporting of <br />high quality data that are representative of site conditions and may be relied upon for due <br />diligence, site closure requests, corrective action plans, or remediation system designs, as <br />applicable. <br />The Phase H site Investigation team will be overseen by Mr. Kevin W. Green, PG, REA, and <br />Kenneth H. Lister, PhD, PG, CHG. Mr. Green is a Vice President and Project Director, and Dr. <br />Lister is a Project Manager of the firm. Dedicated staff will be assigned to each project to ensure <br />continuity. Both have been involved in the completion of hundreds of site investigation and <br />related projects. <br />The complex nature of site investigation projects requires a thorough knowledge of pertinent <br />legal, regulatory, and environmental details. As a full-service environmental consulting firm, <br />SCS has successfully investigated hundreds of sites with environmental concerns utilizing the <br />following services: <br />• Initial site history and background review. <br />• Development of work plans required by regulatory agencies. <br />• QA/QC Plans. <br />• Preliminary site assessments. <br />• Health and safety plans. <br />• Geophysical survey to clear borings or identify subsurface structures. <br />• Subsurface investigations of soil, groundwater, and/or soil vapor to assess the nature <br />and extent of chemicals in the subsurface. <br />• Groundwater monitoring, testing, and hydrogeologic modeling. <br />• Health risk assessment and fate transport modeling. <br />18 <br />25C-125
The URL can be used to link to this page
Your browser does not support the video tag.