My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AMEC GEOMATRIX, INC. 2 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
AMEC GEOMATRIX, INC. 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 11:25:05 AM
Creation date
5/23/2011 10:48:02 AM
Metadata
Fields
Template:
Contracts
Company Name
AMEC GEOMATRIX, INC.
Contract #
A-2011-103
Agency
PUBLIC WORKS
Council Approval Date
4/4/2011
Expiration Date
3/31/2012
Destruction Year
2020
Notes
Amended by A-2011-103-01, -02, -03
Document Relationships
AMEC GEOMATRIX, INC. 2A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
AMEC GEOMATRIX, INC. 2B - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
AMEC GEOMATRIX, INC. 2C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br />amet`y <br />INDUSTRIAL/COMMERCIAL INSPECTOR TRAINING OUTLINE <br />North Orange County MS4 Permit <br />Prepared by: AMEC <br />procedures. This includes appropriate contact lists for the City. Each inspector must be familiar <br />with the procedure to follow when an illicit discharge or illicit connection is observed in the field <br />during the course of an inspection. At a minimum, a call must be placed to the project manager <br />and a follow -up a -mail with an explanation of the incident and associated photos must be sent <br />within 9 business day of the observation. This information will be forwarded to the City. If the <br />release appears to be an immediate threat to human health or the environment, the City (or 999 if <br />appropriate) will be called immediately. <br />ev ❑ Pollution Notification Investigation Report (PNIR) <br />Review PNIR form and documentation requirements for City regarding tracking of ID /1C <br />investigations. <br />Field Training <br />❑ Perform 40 -hours of Joint inspections with experienced inspector <br />® Joint Inspections should focus on a cross - section of the industrial and commercial facilities that <br />may be encountered. 24 -hours of joint inspections should be performed with the Al performing <br />® training taking the lead on the inspection. The remaining 16 -hours ofJoint inspections should be <br />lead by the trainee. At a minimum, joint inspections will be performed at the following types of <br />facilities: <br />• High Priority Industrial Sites (covered under Industrial General Permit) — choose 3 -4 <br />representative facilities (scrap /recycling, chemical manufacturing, auto dismantling) <br />• Medium/Low Priority Industrial Sites — Inspect 2 -3 facilities (machine shops, wood <br />working /cabinetry) <br />• Commercial Facilities — inspect 3 -4 commercial operations. Inspections should focus on <br />sites from the following list: automotive repair, nurseries, file /marble cutting (in some <br />cases may be classified as industrial), landscaping, painting/coating, carpet cleaning, and <br />- car washes. <br />❑ Initial Solo Inspections <br />Inspector will perform one day of solo inspections following 40 -hours of joint inspections and the <br />lead inspector /project manager review (see below). Following the first day of inspections, the <br />Inspector will meet with the project manager to discuss the sites inspected and observations <br />made at each site. The lead inspector /project manager will also review the completed inspection <br />forms prior to sending the inspector out on additional solo inspections. <br />❑ Review of Field Inspection Forms <br />All inspection forms are reviewed by the lead inspector /project manager prior to being sent out <br />Suggestions regarding consistency and Interpretation as well as any other comment are provided <br />to the inspector for review and revision, as necessary. <br />Office /Classroom Training <br />❑ Review General Presentation on Industrial /Commercial inspection Program <br />Includes Introduction language and step by step activities to complete NPOES inspection. <br />Includes examples of scenarios encountered in the field and discussion of liability associated with <br />performing inspections. <br />Pt <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.