My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-12-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
12/19/2011
>
FULL PACKET_2011-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:36:06 PM
Creation date
12/16/2011 3:59:16 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> COOPERATIVE AGREEMENT NO. C-1-3023 <br /> <br /> <br /> <br /> 1 F. To prepare a "Before and After Study" for the PROJECT. As described in the Measure <br /> <br /> 2 M2 Eligibility Guidelines adopted by the AUTHORITY, the "Before and After Study" for the project is <br /> '3 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br /> <br /> 4 B.111.9) for the project. The AUTHORITY shall provide the "Before and After Study" to the <br /> <br /> 5 PARTICIPATING AGENCIES in draft and final formats for comment and comments shall be noted in <br /> 6 the final study. <br /> <br /> 7 G. To provide Ongoing Maintenance and Operation of optimized signal timing after Primary <br /> <br /> 8 Implementation of the PROJECT is completed and continue until the end of the three year grant period. <br /> 9 ARTICLE 5. RESPONIBILITES OF THE PARTICIPATING AGENCIES <br /> <br /> 10 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br /> 11 and funding of the PROJECT: <br /> <br /> 12 A. Provide a technical representative to meet and participate as a member of the <br /> <br /> 13 project's Traffic Forum. <br /> 14 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br /> <br /> 15 project. <br /> <br /> 16 C. To participate and support the PROJECT implementation within the timeframe <br /> 17 outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the <br /> <br /> 18 'AUTHORITY. <br /> <br /> 19 D. To provide the AUTHORITY all current intersection, local field master, and/or central <br /> 20 control system timing plans and related data upon request. <br /> <br /> 21 E. To provide the local match and/or documentation for the in-kind services for the <br /> 22 project in accordance with Attachment B. Failure to provide included match and/or evidence of in- <br /> <br /> 23 kind service may result in the loss of future participation for competitive funds. <br /> <br /> 24 F. PARTICIPATING AGENCIES that have included a dollar match as identified in <br /> 25 Attachment B shall provide payment for the dollar match to the AUTHORITY within 30 calendar days of <br /> <br /> 26 receipt of an invoice. <br /> <br /> <br /> <br /> Page 6 of 16 <br /> 25B-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.