Exhibit 3 <br />0 SAN LORENZO SEWER LIFT STATION <br />■ O ENVIRONMENTAL IMPACT REPORT S.O ExECuiME SUMMARY <br />the existing 20 -foot sewer easement and the permanent condemnation of approximately 292 s.f. of private <br />property. The temporary construction easement would encompass an area consisting of the first five (5) feet <br />westerly of the existing wall and the first ten (10) feet northerly of the existing wall (refer to Section 2.4.3 for <br />a detailed description of the temporary construction easement). Additionally, the City of Santa Ana would <br />need to acquire permanent title to approximately 292 square feet of private property, which is owned by <br />Santa Ana California Lodge, LLC (Studio Inn, APN 410 - 411 -19). This property would be acquired by the <br />City in any manner authorized by law, which in proper circumstances could potentially include adoption of a <br />resolution of necessity by the Santa Ana City Council. <br />Around the new lieft station, landscaping and hardscape improvements are proposed. The Project includes <br />the repaving of a portion of the western end of San Lorenzo Avenue, portions of an existing alley, and a <br />portion of West Segerstrom Avenue, along with the installation of new sidewalks in areas where existing <br />sidewalks have fallen into a state of disrepair and /or would be demolished during lift station construction. <br />An existing wall separating the proposed lift station site from an existing, adjacent motel (Studio Inn) would <br />be removed and replaced with a new, six -foot tall, tan - colored block wall. Some existing landscaping along <br />West Segerstrom Avenue would remain. New landscaping would be installed in a triangular area located <br />between the proposed lift station building and the sidewalk along West Segerstrom Avenue, and would <br />include the planting of one 24 -inch box tree (Brisbane Box), along with shrubs and groundcover (Silverberry <br />and Autumn Sage). Hardscape improvements adjacent to the new lift station would include the installation <br />of new sidewalk, curb, and gutter. <br />The Project also proposes the installation and operation of approximately 1,300 linear feet of new <br />underground sewer infrastructure, including approximately 560 linear feet of 15 -inch gravity sewer pipe; <br />approximately 190 linear feet of 12 -inch gravity sewer pipe; approximately 545 linear feet of 10 -inch force <br />main; and sewer manholes and appurtenances. Construction of these new facilities would occur beneath the <br />paved rights -of -ways of South Bristol Street and West Segerstrom Avenue. The new infrastructure would be <br />needed to connect several existing sewer mains to the new proposed San Lorenzo Lift Station. <br />After construction of the San Lorenzo Lift Station is complete and the new subsurface sewer pipes and <br />manholes are installed, the new lift station would move effluent through the station and into gravity sewer <br />lines, which would convey the sewerage to an existing Orange County Sanitation District (OCSD) treatment <br />facility. Effluent would continuously flow through the San Lorenzo Lift Station and would not be stagnant. <br />The new lift station would replace the Segerstrom Lift Station and would not increase the capacity of the <br />City's existing sewer system. The new lift station facility would be constructed with odor control devices <br />and the City would regularly monitor the facility to ensure it is functioning properly. <br />After the new San Lorenzo Lift Station has been constructed and is in operation, demolition of the existing <br />Segerstrom Lift Station would occur. Demolition activities would involve abandonment in place of the <br />existing lift station, including the removal and disposal of all lift station equipment and filling of the existing <br />wet well manhole with sand. An existing generator, located southerly of the existing lift station, would <br />remain in place and would serve as a back -up power source for the proposed new San Lorenzo Lift Station. <br />Finally, some removal and replacement of existing sidewalk and roadway pavement would occur in <br />association with proposed demolition activities, including the removal /replacement of an existing 80 -foot <br />long by 12 -foot wide bus pad located immediately south of the existing Segerstrom Lift Station facility. <br />Demolition of the existing Segerstrom Lift Station would occur in conformance with all applicable federal, <br />state, and local regulations and standards. Lastly, resurfacing of roadway segments disturbed by Project <br />construction would occur. <br />PAGE S -4 <br />55A -104 <br />