My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />3.4.14.2 Summary Comparison of Environmental Effects <br />The environmental effects of constructing the proposed lift station at Alternative Site No. 12 in <br />comparison to the proposed Project site are shown in Final EIR Table 5 -1 and described in detail in <br />RDEIR Section 5.4.14. Alternative Site No. 12 would avoid the proposed Project's significant and <br />unavoidable impact associated with Construction Configuration C.2; however, this alternative would <br />create a significant and unmitigable near -term impact to transportation /traffic due to a LOS <br />deficiency that would occur for approximately twenty -two (22) days during construction, which is a <br />slight decrease in duration as compared to the twenty -five (25) days of construction during which the <br />proposed Project would create a significant unavoidable impact to transportation /traffic at the South <br />Bristol Street/West Segerstrom Avenue intersection. Impacts to transportation /traffic would also <br />occur when construction activities disrupt left -turn movements, thereby diverting traffic to adjacent <br />intersections or encouraging cut - through traffic in local neighborhoods; such impacts would not <br />occur in association with the proposed Project and would represent a new significant and <br />unavoidable impact to traffic /transportation. Furthermore, construction of a lift station at Alternative <br />Site No. 12 would exacerbate an existing parking deficiency at an existing medical complex both <br />during construction and long -term operation. Near- and long -term impacts to parking at Alternative <br />Site No. 12 would be a significant and unmitigable impact. Since this alternative would significantly <br />impact traffic along South Bristol Street and would significantly impact parking, impacts to <br />transportation /traffic would be greater at Alternative Site No. 12 as compared to the proposed Project <br />site. <br />Total construction air quality /greenhouse gas emissions would be slightly increased under this <br />alternative due to a slightly longer construction period, although average daily construction emissions <br />would be similar to the proposed Project and would not be significant. Near -term nighttime <br />construction noise and long -term odor impacts are assumed to be slightly reduced under this <br />alternative, but as with the proposed Project these effects would be reduced to less than significant <br />levels with incorporation of mitigation. Impacts related to near -term water quality and hydrology <br />also would be slightly decreased under this alternative due to a smaller area of impact, although as <br />with the proposed Project such impacts would be less than significant. Impacts related to operational <br />noise, utilities and service systems, and water quality and hydrology (long -term) would be similar to <br />the proposed Project and would be less than significant. <br />3.4.14.3 Finding and Rationale for Alternative Site No. 12 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 12 infeasible. <br />Alternative Site No. 12 would result in an overall increase in impacts to transportation /traffic as <br />compared to the proposed Project. Although this alternative would avoid the proposed Project's <br />significant and unavoidable impact to the south Bristol Street/West Segerstrom Avenue during the <br />five weeks in which Construction Configuration C.2 would be in place, this alternative would result <br />in a LOS deficiency that would occur for approximately 22 days during construction, would result in <br />new significant unavoidable impacts due to the disruption of left -turn movements along South Bristol <br />Street, and also would result in a new significant and unavoidable impact to parking (near- and long- <br />term). Impacts to parking and turn movements would not occur in association with the proposed <br />Project. In light of these considerations, the City finds that Alternative Site No. 12 would result in an <br />overall increase in near -term impacts to transportation /traffic, and rejects this alternative as infeasible <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -28 <br />CEQA Findings of Fact/Statement of Overriding Considerations <br />55A -67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.