My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />because it would not substantially lessen any significant effects of the Project. (CEQA Guidelines <br />Section 15126.6(b).) <br />This alternative also is rejected as infeasible because it would fail to meet, or would not be as <br />effective in achieving, the proposed Project's objectives. This alternative would exacerbate an <br />existing parking deficiency at an existing medical complex and would interfere with access to this <br />site during construction, and would therefore fail to meet the Project's objective of avoiding <br />detrimental effects to existing businesses. Detrimental effects to business would be further <br />exacerbated by ongoing construction in close proximity to the existing medical complex. Further, <br />unlike the proposed Project site where the City has an existing sewer easement, construction at this <br />location would require the City to acquire private property to provide easements for proposed sewer <br />lines. Finally, construction of the lift station at this location would replace currently developed, <br />useable land, in contrast to the proposed Project site, which is vacant and undeveloped. <br />3.4.15 Alternative Site Location No. 13 (Alternative Site No. 13) <br />3.4.15.1 Summary of Alternative Site No. 13 <br />Alternative Site Location Number 13 (Alternative Site No. 13) would involve the construction of a <br />replacement lift station in the parking lot of an existing commercial building located at <br />approximately 2449 South Bristol Street in lieu of the proposed Project site. Alternative Site No. 13 <br />is located in the same general shopping center as Alternative Site Nos. 14 and 15, which is generally <br />bounded by Central Avenue on the South, Bristol Street on the West, and Warner Avenue on the <br />north. Alternative Site No. 13 would be located in the south - central portion of this shopping center, <br />just northerly of El Pollo Loco (2501 South Bristol Street). Alternative Site No. 13 is located <br />approximately 0.40 -mile north of the proposed Project site. The location of Alternative Site No. 13 <br />is depicted on Final EIR Figure 5 -1. <br />The lift station that would be constructed at Alternative Site No. 13 would include a similar above- <br />ground block structure as the proposed Project. In addition, the lift station at Alternative Site No. 13 <br />would feature similar equipment and appurtenances as the proposed Project. This alternative would <br />require the installation and operation of approximately 65 percent more underground sewer <br />conveyance infrastructure than the proposed Project and it is anticipated that the duration of <br />Construction Phase 11 would be increased by 34 work days (approximately seven weeks) as <br />compared to the proposed Project. The construction schedule for this alternative would otherwise be <br />similar to the proposed Project. <br />This alternative would not require construction activities within the South Bristol Street/West <br />Segerstrom Avenue intersection or beneath the existing paved right -of -way of West Segerstrom <br />Avenue (east of South Bristol Street). Therefore, this alternative would not require the <br />implementation of Construction Configurations B.1, B.2, C.1, or C.2. However, this alternative <br />would require the installation of new sewer facilities beneath the existing paved right -of -way of <br />South Bristol Street that are not proposed as part of the Project (i.e., to the north of the existing <br />Segerstrom Lift Station). The segment of South Bristol Street between this site and the existing lift <br />station facility contains a 20 -inch OCSD trunk sewer, a 36 -inch MWD pipeline, a 16 -inch water main, <br />and a SCE /MCI Duct Bank. These utilities would require special support during construction of the <br />new 18 -inch sewer, as the new sewer line would need to be installed at a depth of approximately 16 <br />feet, and this depth would increase with distance from the existing facility. Construction along this <br />segment of South Bristol Street would require supporting the utilities from the top of the trench <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -29 <br />CEQA Findings of Fact /Statement of Overriding Considerations <br />55A -68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.