My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />for a total duration of three weeks, rather than the five weeks associated with the proposed Project. In <br />addition, this alternative would not require implementation of Construction Configurations B.1, B.2, <br />or C.I. However, this alternative would require the installation of new sewer facilities beneath the <br />existing paved right -of -way of South Bristol Street that are not proposed as part of the proposed <br />Project (i.e., to the south of the South Bristol Street/West Segerstrom Avenue intersection). The <br />segment of South Bristol Street between this site and the existing lift station facility contains a 20- <br />inch OCSD trunk sewer, a 36 -inch MWD pipeline, a 16 -inch water main, and a SCE /MCI Duct Bank. <br />These utilities would require special support during construction of the new 18 -inch sewer, as the <br />new sewer line would need to be installed at a depth of approximately 16 feet, and this depth would <br />increase with distance from the existing facility. Construction along this segment of South Bristol <br />Street would require supporting the utilities from the top of the trench and /or the use of trench <br />boxes /shields, which would elongate the construction schedule. Due to these existing utility <br />constraints beneath South Bristol Street, portions of this roadway would need to be closed to <br />accommodate construction associated with this alternative, which has the potential to result in <br />adverse effects to vehicular circulation. Moreover, the duration of construction for this alternative <br />site location would greatly increase due to the need to cross the railroad tracks running parallel and <br />north of Alton Avenue. Implementation of this alternative would otherwise be similar to the <br />proposed Project during construction conditions. <br />Development of a lift station at Alternative Site No. 19 would require the City to acquire private <br />property to accommodate the proposed lift station. In addition, this alternative would require the <br />City to acquire a temporary construction easement to facilitate construction of the proposed lift <br />station. <br />3.4.21.2 Summary Comparison of Environmental Effects <br />The environmental effects of constructing the proposed lift station at Alternative Site No. 19 in <br />comparison to the proposed Project site are shown in Final EIR Table 5 -1 and described in detail in <br />RDEIR Section 5.4.21. This alternative would reduce the proposed Project's significant and <br />unavoidable impact associated with Construction Configuration C.2 by two (2) weeks; however, this <br />alternative would result in a significant unavoidable impact to the capacity of the South Bristol Street <br />roadway for a total of 109 days (or 89 days longer than the proposed Project's significant <br />unavoidable impact). Furthermore, construction of a lift station at Alternative Site No. 19 would <br />exacerbate an existing parking deficiency at this existing commercial retail building both during <br />construction and long -term operation. Near- and long -term impacts to parking at Alternative Site No. <br />19 would be a significant and unmitigable impact. As such, impacts to traffic and circulation would <br />be greater at Alternative Site No. 19 as compared to the proposed Project site. <br />Total construction air quality /greenhouse gas emissions would be increased under this alternative due <br />to a longer construction period, although average daily construction emissions would be similar to <br />the proposed Project and would be less than significant. In addition, construction - related impacts to <br />water quality and hydrology would be increased under this alternative due to a larger area of impact, <br />although such impacts would be less than significant. As with the proposed Project, impacts <br />associated with nighttime dewatering activities during construction would be reduced to less than <br />significant levels with compliance with Mitigation Measure MM 3.3 -2. Long -term odor impacts <br />associated with accident conditions would be slightly decreased under this alternative in comparison <br />to the proposed Project and would be less than significant similar to the proposed Project. Impacts <br />related to long -term noise, utilities and service systems, and water quality and hydrology (long -term) <br />would be similar to the proposed Project and would be less than significant. <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -42 <br />CEQA Findings of Fact/Statement of Overriding Considerations <br />55A -81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.