Laserfiche WebLink
09101100 <br />Governmental or Quasi - Governmental Fees or Charges <br />Traffic Signals <br />Monument signs <br />• Dewatering <br />• Window Coverings <br />• Voice & Data Wiring. Conduits w/ pull wire only shall be provided within walls. <br />Davis Bacon Wages. Contractor will provide in accordance with Prevailing <br />Wage Rates only. <br />Field Surveying & Engineering <br />Site Remediation <br />Playground Equipment <br />• Brick Pavers <br />• Landscape & Irrigation <br />• Flagpoles <br />Glass Block Masonry <br />Security Grilles. Rated roll -down door at Kitchen 118 is included. <br />Skylights <br />Wall Coverings <br />Wood Flooring <br />• Lockers <br />Kitchen Equipment / HE <br />Folding Partitions <br />• Projection Screens <br />• Canvas Awnings <br />• P.A. / AudioNisual Systems <br />• Fire Pump <br />• <br />Emergency Generator <br />Relocation of Power Poles <br />4, Qualifications: <br />The following qualifications are specifically included in the scope of work, as a result of <br />redesign: <br />a. Fireproofing included for the Multi- Purpose Room beam only. <br />g, Public Walkway: <br />The Public Walkway on Central Avenue adjacent to the Project will be closed in its entirety. No <br />temporary plywood barricades, overhead canopies or replacement of walkways except as shown <br />on drawings are considered in Guaranteed Maximum Price (GMP). Should the City of Santa Ana <br />require such, it shall be considered a Change Order to the Contract. <br />6. Domestic Water and Fire Water: <br />City shall install the domestic water service and the domestic water meter to the property line off <br />of Central Avenue. Contractor shalt connect to the water meter and bring in water service to the <br />building. Fire water service shall be installed by the Contractor including hot tap connection at <br />the street, as indicated on utility plans. Domestic water service shall be installed by the <br />contractor, including hot tap connection within property line off of Central Avenue as indicated <br />on utility plans. <br />7. Contractors Fee: <br />The Contractors Fee shall be a Fixed Sum of $244,405, and shall not be determined as a <br />percentage. Such sum not shall decrease or increase, but shall remain Fixed, except as modified <br />in Article 5.1.3, and /or through change orders. <br />2 <br />F:\Data\PROJECTS\9929\Ccntracts\ExhibitA.doc <br />