09/01/00 <br />8. General Conditions: <br />The General Conditions shall be based upon actual costs, which is estimated at the $255,104, as <br />shown on Exhibit D. Actual General Conditions shall be paid by Owner, to a maximum of <br />$255,104, except as noted in footnote 2, above. Individual line items can be modified and <br />adjusted to fit actual conditions by the Contractor. No General Conditions cost will be added <br />unless project completion is delayed by conditions beyond the direct control of the Contractor. In <br />such case Contractor shall receive reimbursement in accordance with 14.6.D. <br />Construction Schedule <br />The construction schedule as attached as Exhibit D, dated 8/31/00, specifically indicated required <br />dates for permits and issuance of drawings to the Contractor for bidding purposes. This G.M.P. is <br />based upon conformance that all permit dates and drawing issuance dates be completed on or <br />prior to the date indicated. Delays in these dates, not caused by the Contractor, shall be extended <br />to the overall completion date of the schedule. These additional days will be subject to additional <br />General Condition costs, plus fee, as defined in Article 14, 14.6, Item C and Exhibit A, Item 2. <br />10. Site `York <br />a. No new concrete approaches have been considered on this GNIP. <br />b. Existing approach on Central Avenue is being utilized. <br />c. The parking lot is being constructed in accordance with a temporary lot. <br />d. No concrete curbs, swales, gutters are considered other than as indicated on Exhibit B - Civil <br />Documents <br />e. Redwood headers are included <br />f. Site sidewalks are limited to the building perimeter as identified on Exhibit B Civil <br />Documents. <br />g, Perimeter fencing is chain link. <br />idered in this, GMP, only minor irrigation s,leeving <br />h. No landscaping or irrigation is cons <br />required for future irrigation. <br />i. Irrigation meter and service shown on Civil Documents shall be deleted and is not included. <br />j. No offsite street work on.Central Avenue or Warner Avenue has been considered in the GNU <br />other than identified on Civil Documents per Exhibit B <br />k. Flagpoles are not included. <br />1. Monument signs and exterior building signage is not included. <br />m. Soils report issued by Leighton & Associates dated 4/12/96 has been considered. Any future <br />revisions, findings, and/or recommendations will be subject to additional costs. <br />11. Building Concrete <br />Finish of interior concrete at public areas 100, 107, 124, 117, and Courtyard is colored concrete <br />with an acid etch finish or equal. These areas are limited to tile areas previously indicated on <br />MVE reference plans dated 9/30/98. <br />12, Masonry Veneer <br />All exterior and interior masonry, veneer indicated on NIVE's reference plans issued 9/30/98 has <br />been deleted and replaced with exterior plaster. <br />13. Ornamental Metals <br />All site decorative fending and gates are not.included. Chain link fending and (1). Manual rolling <br />gate and (1) pair of pedestrian chain link gates will be provided. <br />14. Roof Structure <br />The clerestory structure as indicated on MVE's reference plans issued 9/30/98, has been delete <br />it, its entirety. The roof structure has been simplified. No skylights have been considered. <br />F: \Data \PROJECTS \9929 \C o ntr a cts\Exh ibitA. d oc <br />