Laserfiche WebLink
iii. <br />Sidewalks; <br />V. <br />Windows; <br />V. <br />Trash receptacles; <br />Vi. <br />Utility boxes and covers; <br />Vii. <br />Signs; <br />Viii. <br />Bus stops and shelters; <br />ix. <br />News racks; <br />X. <br />Doors; and <br />A. <br />Flag poles. <br />Work on private property shall not be performed without the Consent form signed by the owner or <br />authorized by the Project Manager and /or his /her designee. A sample of the Consent form is <br />provided as Attachment 1. The contractor shall obtain the signature of the property owner on the <br />consent form prior to beginning work. Original consent forms shall be returned to the Project <br />Manager and /or his /her designee on a weekly basis and are the property of the City. <br />d. City Parks <br />At the City's discretion, if funded and approved, Proposer will remove graffiti in the Parks not <br />visible from the right -or -way, including, but not limited to: <br />i. Restrooms — Interior and Exterior; <br />ii. Park Exterior Facilities (snack bars, storage closets, rec. buildings); <br />iii. Concrete structures (i.e. sidewalks, paths, bridges, trails); <br />V. Bike Paths; <br />V. Walking Paths; <br />Vi. Bleachers; <br />Vii. Baseball /Softball Diamonds; <br />viii. Trash Receptacles; <br />ix. Rocks; <br />X. Doors; <br />X1. Fences; <br />xii. Windows; <br />xiii. Utility boxes and covers, and <br />AV. Park Trees; <br />The above work will be priced separately from the Pricing Section Grand Total Price in Exhibit B. <br />e. Unless notified otherwise by the Project Manager and /or his /her designee, graffiti shall be <br />removed so no trace of the pre- existing graffiti remains. <br />f. Protect the surfaces adjacent to the area to be abated. <br />g. Abate the entire surface in the event that the graffiti covers a significant area of the surface. The <br />Project Manager or his /her designee shall determine whether or not an entire surface will be <br />abated on a case by case basis. <br />h. Ensure protection of the work area at all times, including, but not limited to <br />I. Barricade the area of work at safe distances, so as to prevent unauthorized access to <br />the area; <br />ii. Barricade area of work within the public right -of -way; <br />iii. Using warning signs and safety cones to inform the public of work being conducted; <br />iv. Immediately correct damage to the work site; <br />V. Leave work site in undamaged condition; <br />Vi. Post signage to identify wet paint; <br />City of Santa Ana GRSC Services RFP Page 13 <br />