My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR THE HERITAGE 2001 E DYER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
75A - PH - EIR THE HERITAGE 2001 E DYER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:39:05 PM
Creation date
1/28/2016 4:04:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
2/2/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2015 -01, AA No. 2014 -04, <br />GPA No. 2016 -03, DA No. 2015 -03 & VTTM No. 2015 -03 <br />October 12, 2015 <br />Page 7 <br />As a result of these impacts that cannot be mitigated to a less than significant level, adoption of a <br />Statement of Overriding Considerations is required prior to approving the project. A Statement of <br />Overriding Considerations is the process through which decision makers balance the economic, legal, <br />social, and technological or other benefits of the proposed project against its unavoidable <br />environmental impacts. <br />General Plan Amendment <br />To allow the construction of a mixed -use development on this parcel, a General Plan amendment is <br />required. Currently, the land use designation for this site is Professional and Administrative Office <br />(PAO), which allows office development and ancillary commercial uses. This project will require an <br />amendment to the Land Use Element to amend the General Plan Land Use designation of the site to <br />District Center (DC) with a General Plan floor area ratio of 1.70 (Exhibit 12). The floor area ratio was <br />derived by calculating the square footage of the development (excluding parking structures) along with <br />the square footage of the existing structure that will remain. <br />Staff has identified a concern with the inconsistency of the project with the existing Land Use <br />Element of the General Plan, The Professional and Administrative Office land use designation of <br />the site, along with approximately 300 acres of land located on the east side of the Newport -Costa <br />Mesa (SR -55) Freeway, are primarily intended to provide an environment for office and business <br />park development in an area of the City where office, research and development, and industrial <br />uses are the predominant land uses. Maintaining these uses in the City is key to promoting and <br />encouraging major employment centers at locations which have a low vacancy rate, are located in <br />a stable industrial area, and contain little to no heavy industrial businesses that adversely impact <br />other nearby businesses, Additionally, areas such as this section of the City provide a rich <br />employment base for many residents of the City and those in the region who work in the area. <br />The City has recently initiated the process to update its General Plan, which is the blueprint for <br />future development. A key component of the update process is the identification of sites for future <br />development, including but not limited to mixed -use development. Staff has identified the <br />southeast section of the City, including the project site, as a potential area for mixed -use <br />( residential /commercial /industrial) development, with residential development contemplated at a <br />maximum of 100 units per acre. This area will be studied in greater depth as the update process <br />continues, with a final determination on the eventual land use designation expected in the next one <br />to two years. <br />If approved, the project could support several goals and policies of the recently adopted Housing <br />Element. First, the project would be consistent with Goal 2, which encourages diversity of quality <br />housing, affordability levels, and living experiences that accommodate Santa Ana's residents and <br />workforce of all household types, income levels and age groups to foster an inclusive community. <br />Second, the project would support Goal 4, to provide adequate rental and ownership housing <br />75A -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.