Section 5
<br />LOS "B" is in the range of stable flow, but the presence of other Users in the
<br />traffic stream begins to be noticeable. Freedom to select desired speeds is
<br />relatively unaffected, but there is a slight decline in the freedom to maneuver,
<br />LOS "C" is in the range of stable flow, but marks the beginning of the range of
<br />flow in which the operation of individual users becomes, significantly affected by
<br />interactions with others in the traffic stream.
<br />LOS "D" represents high-density but stable flow. Speed and freedom to
<br />maneuver are severely restricted, and the driver experiences a generally poor
<br />level of comfort and convenience.
<br />LOS "E" represents operating conditions at or near the capacity level. All speeds
<br />are reduced to a low, but relatively uniform value. Small increases in flow will
<br />cause breakdowns, in traffic movement.
<br />LOS "IF" is used to define forced or breakdown flow. This condition exists
<br />wherever the amount of traffic approaching a point exceeds the amount which
<br />can traverse the point.
<br />Roadway Segment Level of Service
<br />Roadway segment levels of service are estimated by comparing daily traffic
<br />volumes with the traffic volume capacity of the roadway based upon its functional
<br />classification. The daily traffic volume based LOS criteria (capacity values)
<br />obtained from the City of Santa Ana General Plan Circulation Element for the
<br />various types of roadway segments is shown in Table 86, The City of Santa Ana
<br />considers LOS "E", and "F" unacceptable for roadway segments. Therefore, for
<br />the purposes of environmental impact analysis, a project is considered to have a
<br />significant traffic Impact at an intersection if the LOS deteriorates from acceptable
<br />(i.e., LOS "l or better) to unacceptable (i.e., LOS "E" or "F") with the addition of
<br />project traffic, and the project contributes a 1 % or greater increase in the ICU
<br />value.
<br />Table 86: Level of Service Criteria Roadway Segments
<br />Arterial
<br />Lanes
<br />LOS-A
<br />LOS 4
<br />LOS-0
<br />LO$
<br />LO$-F,"
<br />LO$ P'
<br />Principal
<br />6 -D
<br />45,000
<br />52,500
<br />60,000
<br />67,500
<br />75,000
<br />>75,000
<br />Major
<br />6-D
<br />33,900
<br />39,400
<br />45,000
<br />50,600
<br />56,300
<br />>56,300
<br />Primary
<br />4-D
<br />22,500
<br />26,300
<br />30,000
<br />33,800
<br />37,500
<br />>37,500
<br />—Secondary
<br />Commuter
<br />4-UD
<br />2-UD
<br />15,000
<br />7,500
<br />— 17,500
<br />8,800
<br />20,000
<br />10,400
<br />1 22,500
<br />11,300
<br />1 25,500
<br />12,540
<br />>25,000
<br />?12,500
<br />Mid Basin Centennial Park �1,e&ffiProject Final EIR 5-221