Laserfiche WebLink
Section 5 <br />Weekend Parking Survey <br />A weekend parking survey was conducted at Centennial Park on June 13, 2015 <br />from 9:00 am to 4 pm. Hourly parking counts were counted for each parking <br />section to determine occupancy. As shown in Table 94, there was surplus of <br />parking available for park users. The construction operations for the Proposed <br />Project would temporarily displace some parking spaces. Table 94 shows the <br />amount of parking that would be available at each parking area when <br />construction activity would be occurring based on the maximum occupancies <br />identified in the weekend parking analysis. Even though there would be reduced <br />parking available at some parking lots, there would still! be an overall surplus of <br />parking at Centennial Park when construction activities are occurring to meet <br />park user parking demands. Potential weekend parking would be less than <br />significant. <br />Table 94: Summary Weekend Parking Impacts <br />Parking <br />Area <br />Available <br />Parking <br />Spaces <br />MaxImum, <br />Occupancy <br />surplus <br />Spaces <br />Reduced <br />Spaces From <br />�Consiructlorlr <br />Activity <br />Not <br />Parking <br />AvalliNe <br />1 <br />132 <br />45 <br />87 <br />52 <br />35 <br />2 <br />32 <br />23 <br />9 <br />20 <br />-11 <br />3 <br />86 <br />19 <br />67 <br />0 <br />67 <br />4 <br />322 <br />30 <br />1 292 <br />1 42 <br />1 250 <br />5 <br />145 <br />112 <br />33 <br />311 <br />2 <br />Overall <br />717 <br />196 <br />488 <br />145 <br />343 <br />Centennial Park Parking Area Circulation <br />The parking analysis has identified that there would be available parking within <br />Centennial Park when well drilling/construction/development activities and well <br />equipping activities are occurring. There could be instances where the available <br />parking could be located in more distant parking areas that what would typically <br />be used. To avoid potential adverse circulation impacts from vehicle searching <br />for parking, a signage program would be implemented that would identify parking <br />lots where construction activity is not occurring and where there would be <br />available parking. Within the implementation of Mitigation Measure T- 5 potential <br />circulation impacts within parking areas under construction would be reduced to <br />less than significant. <br />Mid Basin Centennial Park �961- nT 11 Project Final EIR 5-237 <br />18F <br />