Laserfiche WebLink
Section 5 <br />Alternative 3: Lower Intensity Alternative <br />Under Alternative 3, there would be temporary closure of the bike lane and <br />sidewalk along Edinger Avenue. Compared to the Proposed Project potential <br />impacts would The similar and with the implementation of Mitigation Measure T-1 <br />potential pedestrian conflicts would be reduced to a less than significant level. <br />Alternative 4: Pipeline Design Alternative <br />Under Alternative 4, there would be temporary closure of the bike lane and <br />sidewalk along Edinger Avenue. Compared to the Proposed Project potential <br />impacts would be similar and with the implementation of Mitigation Measure T-1 <br />potential pedestrian conflicts would be reduced to a less than significant level. <br />Mitigation Measures <br />Mitigation Measure T-1 is required. <br />Level of Impact <br />Alternative 1: No adverse impact <br />Alternative 2: Less than significant impact with Mitigation Measure T-1 <br />Alternative 3: Less than significant impact with Mitigation Measure T-1, <br />Alternative 4: Less than significant impact with Mitigation Measure T -1. <br />�J Mid Basin Centennial Park �1 nf4yroject Final EIR 5-242 <br />ed- <br />