Laserfiche WebLink
ENVIRONMENTAL IMPACT RP.PORT ADDENDUM ARMSTRONG RANCH -REVISED PROJECT <br />SPPTELSRR 5017 SANTA'%NA. CALIFORNIA <br />Findings Related to Hydrology and.Water Quality: <br />No New Significant Rffects Requiring Major Certified-EIR Revisions. Based on tite foregoing- <br />analysis'and infonnatipn,'thcrc is no evidence that Project modifications requirea major change -to the <br />Certified EiR. The.Project,changes will not result in new sl&nificant environmental impacts related to <br />Hydrology and Mater Quality, and there is no substantial increase in the severity of impacts described <br />in the Certified MR. <br />No Substantial Change'!it Circumstances Requiring Maibr Ci rtified EIH Revisions: There is no <br />information in the.record or otherwise available that indicates that there are substantiafchanges in <br />circumstancesspertaining to,Flydrology and Water Quality that Would require major changes to the <br />Certified EIR. <br />No New Information Sbowing Greater Significant Effects than the Certified EIM'fhis <br />Addendum has analyzed all availablerelevant information to determine whether there is new <br />information thatt was,not available at the time the F.rR wits adopted, which would indicate that a new <br />significant effect not reported in that d&umitiu night occur. Based on the infonitation and analysts <br />above,.there is nq snbstantial.new uifonnation indicating that there would be a new significanTitnpact <br />related to,Hydtplogyand Nater Quality requiring major reeiaions to the CeLifed'EIR: <br />No New Information Showing Ability to Reduce Significant IYfects in theCertified EiR. Them <br />are no altematives to the Project or additional mitigation measures that would substantially reduce <br />one or more significant impacts pertaining to hydrology and Nater Quality identified in and <br />considered by the Certified EIR. <br />Nsfiol!>.11'>1Alcud;ImlArlAcnAinn.dnn ;d7910V[ 7;; <br />75B-96 <br />2-47 <br />