My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL I MPACT-REPORr AC CENDUM AkMSTRONO RANCH REV'eEO PROJECT <br />EEPTEMEER IQL7 MAN'I'A AICAs CALIFORNIA <br />2,10 LANDU5E/F.LANNING ' <br />N.W, (CRsRWrnntlal <br />slgdiaetnl More $drre Cfisnye.rrmo <br />Would the project: LRpact" Impact, Ivok..vA..Iy�.F <br />of an agcney'+vnh lurkdiction over the t>rolecl (inclniling. but <br />not tunilLd to fill general plan plannedcommunity; or zoning El 1:1ordinance) adopted for the purpose of avoiding or mitgaring'an <br />environmental effect^ <br />(c) Conflict wiih any applicable habitat conservation plan or natural I ❑" ❑ <br />Analysis of Project Changes: <br />a) 'the.Project site is bound by Alton' Avenue to the north, residential uses to the cast (Armstrong <br />Ranch) MacArthur Boulevard to the. south, and Jaguar Way to the we,% in its existing condition_; <br />the northern portion of the Project site is developed with,a smell sanctuary (.5 I associated <br />with the Christ Our Savior Catholic'Cliurchand a parking lot that serves the Church; the southerii. <br />portion of the'Project,site is vacant. <br />The Revised Project includes the development of42.single-family residential units on a curr ntly <br />undeveloped portion of the site. hnplementation of the Revised Project would not change the <br />existing sitceonfiguralion within the Project site or within the local area, icor would it change the <br />existing street layout. The Revised Prgjeet proposes an access driveway from the Jaguar Way cul- <br />de-sac, utilization of the existing south leg of the JaguarWiy116ton Avenue'intersection, and a' <br />right hr'tight-ouCdrivewa)+ ori Alton Avenue. Therefore;'[lne Revised Project would not result in <br />the physical division of airy bstablished community, and no mitigation is required. The Revised <br />Project would not result in new siionificimt itnpacts beyond tliose identified in the Certified FIR: <br />r4. view iiinigntion measures are r'e%ircd:: <br />b) The Projecrsite is within the Cityof Santa Ana.'The main documents" guiding development and <br />regulating land uses in the City of Santa Ana are the City's General Plan and Zoning Ordinance., <br />As previously stated; the Project site'is designated 1.11-7 in the Gencral Plan, and is zoned SU -4 on <br />the City's Zoning Map. <br />General Plnn.The City of Santa Anna Geticral Plan is the Cily's most Fundamental planning' <br />document. Tlie General Plan is a comprehensive plan in,compr6cnsivc plan intended to guide <br />the physical development of the City and serves is a blueprint for future growth and <br />development: As a blueprint for the "future, the plan contains policis and programs' designed to <br />prolvide decision -makers with a solid, basis for decisions.related to land use and development. <br />The Revised Project would develop a new Church facility oil ail existing Church site; which <br />would replace the existing'oti-site use yilh [lie same usp. Tbe`Revised Protcct'wouldi also develop <br />law -density residential uses on the southern portion of the' Project site, which would tie consistent <br />with the site's 1,R-7 General Plan designation as well as the surrounding residential uses. Because <br />the Revised Project is consistent • with the existing use and the General Plan land use designation <br />for the site, the Revised Project would also be Consistent with applicable goals and policies <br />Y:'SIIUI(rP1't1drlrnllum`�+1ddrndum.docx !!77ii)iJl i» <br />75B-97 <br />2-48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.